dispatching method造句
例句与造句
- Elevator dispatching method in idle traffic mode based on elevator traffic probability simulation model
基于电梯交通流概率仿真模型的空闲交通模式电梯调度方法 - The main problems of them are concentrated in bus architecture , mechanical structure and heat dispatch method
现有系统的主要问题在总线结构、机械结构和散热方式三个方面。 - The efficient planning and dispatching method and technology are the bases of advanced manufacturing technology
有效实用的计划调度方法和优化技术是先进制造技术实践的基础。 - The forth chapter is about linux virtual server . its structure , dispatching methods and scheduling algorithms are discussed in detail
第四章介绍了构建服务器集群的技术之二: linux虚拟服务器,分析了其体系结构、负载均衡策略和调度算法。 - This paper works out optimized bus architecture , a mechanical structure that takes compressibility into account , and an improved heat dispatch method without fans
针对这三方面的问题,本文给出了优化的总线结构、考虑可压缩性的机械结构和无风扇散热方案的改进措施。 - It's difficult to find dispatching method in a sentence. 用dispatching method造句挺难的
- Both the client and the server remoting infrastructure must know this information to create proxies for and dispatch method invocations to the remote server object
客户端和服务器远程处理基础结构都必须了解这些信息,才能为远程服务器对象创建代理并将方法调用调度到远程服务器对象。 - As the zsi dispatch method does not allow for additional parameters , we need to store the current message id so we can set it in the results on the instance of the server
由于zsi _ dispatch方法不允许额外的参数,所以我们需要在服务器的实例中存储当前消息标识(这样我们就可以在结果中设置它了) 。 - The directed graph model of agvs is used to give a mathematical tool for the research of dispatching methods and routing algorithms of agvs ; the colored tempo - petri net system model of agvs is mainly used to describe the concurrency of agvs and the conflict of agvs
有向图模型主要于为通过仿真来研究自动导引车的调度方法和路由算法提供了一个有效的数学工具;而有色时延petri网系统模型则主要用来在计算机仿真系统中描述agv之间的冲撞和agvs的并发特性。 - System operators can grasp the all units " states in global and by the simulation results they can make out correct the dispatching method , improve the performance of whole power system and decide rightly the quantity of units which can satisfy the load requirement of current power system
而且利用这种仿真算法和机组调度算法结合的仿真软件可以仿真机组的调节过程,由这一模拟过程可以制定相应的调度策略,改善负荷调节与系统需求趋势相反的机组的运行状态,更好的确定适应系统负荷需求量的机组。 - Using flood progress model and the different discharge of feilaixia reservoir , we can calculate in time the water level and discharge of middle - lower reaches of beijiang , thus increase the accuracy of flood forecast and provide the important technical support for the further research on the optimal dispatch method of f lood control system
其中依据水文学和水力学相结合的洪水演进模型,可根据飞来峡水库不同的下泄流量,及时计算北江中下游河道的水面线和下泄流量,提高了洪水预报的精度,为进一步研究防洪体系优化调度方法提供极其重要的技术支撑。 - This thesis concludes the flood control situation , engineering measures and the situation of optimal dispatch method . it studies flood control engineering system , which is composed of flood prevention reservoir , river course dyke and natural detention basin , and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang . it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics
本论文总结了我国防洪情势、防洪工程措施及其优化调度方法研究的现状;针对珠江流域北江中下游防洪体系的组成及其防洪工程的特性,研究由防洪水库、河道堤防和天然滞洪区共同组成的防洪工程体系中各防洪工程措施之间的关系;提出了以洪灾损失最小为目标函数、以水文学和水力学相结合的洪水演进方程等要求为约束条件的北江中下游防洪体系优化调度策略框架。 - Combined with the significant project - gongboxia hydro - power station construction , emphasized on construction during flood period of power station construction period , the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed , some problems in construction during flood period such as flood propagation time , interval flood discharge forecast , construction risk , flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied , with an aim at presenting real interval flood forecast scheme and dispatching method , so as to provide technological support for gongboxia hydro - power station construction period
本论文结合国家重点工程项目?公伯峡水电站的建设,以电站建设期施工渡汛为研究重点,从实施出发,分析黄河上游气候特性和梯级水库群的实际运行状况,对施工渡汛中的主要问题?洪水流达时间、区间洪水预报、渡汛风险、汛期预警、龙羊峡水库在渡汛中的作用等进行了比较全面深入的研究,目的在于提出可用于实际的区间洪水预报方案和调度方法,为公伯峡水电站施工期建设提供技术支撑。